Sunday, September 20, 2015

Lime Rock Historics 2015 - Part 1

 This past Labor Day, I had the opportunity to go to Lime Rock Park for the 2015 Historic Festival 33. Here is Part 1 of the pictures and videos I took:


















Wednesday, September 9, 2015

Diesel Land Speed Racer Mk2 - Part 4 - Wheels, Wires, and Welding

The next step of the project was to fabricate and install the front engine mounting plate. This required a bit of headscratching, because it was necessary to carve a clearance into the engine block, in order to avoid modifying the front frame bend. As a result, the frame had to pass THROUGH the mounting plate. 

I accomplished this by machining a pair of slots into the plate that allowed the tubes to pass through. Next, I welded a brace underneath the tubes that joined and strengthened the three edges of the plate.


 




Shaping the front mount brace



Adding reinforcement braces

Fully Welded



After the frame was finished, I replaced the wheel bearings with a set of homemade tools. I took the opportunity to upgrade from the old two-piece tapered bearings to single-piece ball bearings.


New bearings and a custom-made installation tool
Removing the old bearing race



Knocking in the new bearings
Motor bolted in place

Beginning the wiring harness



Sunday, August 30, 2015

Diesel Land Speed Racer Mk2 - Part 3 - Motor Mounts And Setbacks

During the summer, work has slowly progressed on the second diesel bike. The first major milestone was installing the welded motor mounts on the Sportster frame. I hit a snag when a hidden rotten section blew through, but I was able to clean it up and cover it with a welded patch.

 

Rotten section

Bad metal carved out and cleaned

Fabricating the patch

Tacked in place

Repaired



Pressing in fresh wheel bearings




Friday, July 3, 2015

Diesel Land Speed Racer Mk2 Part 2 - Fabrication Begins (With a Vengeance!)

This is going to be a huge photo-dump of diesel Sportster progress pics. Work has been progressing steadily on and off since December, and the basic form is starting to take shape. I bobbed the rear fender, discarded the front fender, sandblasted both, and had them powder-coated green metalflake.












I chose powder-coat over paint because the paint on the first diesel got stained by leaking fuel. Powder has a harder finish and better chemical resistance.

The next step has been modifying the frame and engine so they can fit together. I shaved the rear valve cover to improve the clearance.





The final major hurdle before I can assemble a rolling chassis will be fabricate the engine mounts. I am using flat bar stock and a MIG welder to slowly construct a strong foundation for the huge v-twin.









Sunday, June 21, 2015

Steam Engine Restoration - Shaking Out The Cobwebs (Video Post)

This is the long-overdue higher resolution video of the steam engine running. It has been on display inside for nearly 8 months, so I pulled it out, wiped it down, regreased everything, and hooked it up to some air. Runs like a champ!